Triple

T3788568
Position Surface form Disambiguated ID Type / Status
Subject Three Gorges Dam E89587 entity
Predicate worldRankingByInstalledCapacity P38632 FINISHED
Object one of the largest power stations in the world LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: one of the largest power stations in the world | Statement: [Three Gorges Dam, worldRankingByInstalledCapacity, one of the largest power stations in the world]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: worldRankingByInstalledCapacity
Context triple: [Three Gorges Dam, worldRankingByInstalledCapacity, one of the largest power stations in the world]
  • A. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • C. capacityRankInWorld chosen
    Indicates the relative position or ranking of an entity’s capacity compared to all similar entities worldwide.
  • D. windFarmCapacity
    Indicates the total power generation capacity of a wind farm, typically measured in units such as megawatts.
  • E. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9597d6881909b6ee3b9de859223 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeecefa3608190a7a20ed6df6a64b2 completed March 9, 2026, 3:53 p.m.
PD Predicate disambiguation batch_69aee743c8d08190a9f9c97b836bd703 completed March 9, 2026, 3:29 p.m.
Created at: March 9, 2026, 3:14 p.m.