Triple
T37882891
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Layout of Fleetwood, Lancashire |
E944914
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seaside resort plan |
C42723
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seaside resort plan Context triple: [Layout of Fleetwood, Lancashire, instanceOf, seaside resort plan]
-
A.
resort masterplan
chosen
A resort masterplan is a comprehensive conceptual layout that organizes the spatial, functional, and experiential components of a resort development, integrating architecture, landscape, infrastructure, and amenities into a cohesive vision.
-
B.
seaside residence
A seaside residence is a home located near or directly on the coast, designed to provide convenient access to the beach and scenic ocean views.
-
C.
seaside residential area
A seaside residential area is a coastal neighborhood where homes are situated near the shore, offering residents direct access to the beach and ocean views.
-
D.
seaside facility
A seaside facility is a coastal establishment that provides services, amenities, or infrastructure for recreation, tourism, or marine-related activities along the shoreline.
-
E.
resort
A resort is a commercial establishment that provides lodging, dining, recreation, and leisure amenities in a single destination designed for relaxation and vacation experiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ef02668819089e7940c4001af5e |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:19 p.m.