Triple

T37881242
Position Surface form Disambiguated ID Type / Status
Subject Second Five-Year Plan of the People's Republic of China E944870 entity
Predicate instanceOf P0 FINISHED
Object Five-Year Plan of China C61086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Five-Year Plan of China
Context triple: [Second Five-Year Plan of the People's Republic of China, instanceOf, Five-Year Plan of China]
  • A. Chinese national project chosen
    A Chinese national project is a large-scale, state-led initiative undertaken by the Chinese government to advance strategic economic, technological, social, or infrastructural goals at the national level.
  • B. New Economic Mechanism
    The New Economic Mechanism was a set of economic reforms introduced in socialist countries (notably Hungary in 1968) that sought to decentralize planning, increase enterprise autonomy, and incorporate market-like incentives within a planned economy.
  • C. Soviet economic policy
    Soviet economic policy refers to the centrally planned, state-controlled system that directed production, distribution, and investment according to government-determined goals rather than market forces, aiming to rapidly industrialize and achieve socialist objectives.
  • D. Deng Xiaoping’s Southern Tour
    Deng Xiaoping’s Southern Tour refers to his influential 1992 trip to southern China, during which he reaffirmed and accelerated China’s market-oriented economic reforms, revitalizing the reform agenda after the political turmoil of 1989.
  • E. work by Mao Zedong
    A "work by Mao Zedong" is any written, spoken, or otherwise recorded piece of political, philosophical, or military thought authored or co-authored by Mao Zedong.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef02668819089e7940c4001af5e completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.