Triple
T37866904
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thornton Creek Watershed Action Plan |
E944495
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | watershed action plan |
C55437
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: watershed action plan Context triple: [Thornton Creek Watershed Action Plan, instanceOf, watershed action plan]
-
A.
river basin management plan
A river basin management plan is a strategic framework that outlines coordinated actions, policies, and measures to sustainably manage water resources, ecosystems, land use, and human activities within a defined river basin.
-
B.
watershed association
A watershed association is a community-based organization dedicated to protecting, restoring, and sustainably managing the land, water, and ecological resources within a specific watershed.
-
C.
watershed district
A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
-
D.
water quality control plan
chosen
A water quality control plan is a structured document outlining the strategies, procedures, and standards used to monitor, manage, and maintain water quality to meet regulatory and environmental requirements.
-
E.
watershed preserve
A watershed preserve is a protected natural area managed to safeguard the land, water, and ecological processes that collect, store, and filter water within a drainage basin.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eee2f9c8190b1272aa2ee55ebf5 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:19 p.m.