Triple
T37860578
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Phong reflection model |
E944314
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | local illumination model |
C66099
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: local illumination model Context triple: [Phong reflection model, instanceOf, local illumination model]
-
A.
lighting program
A lighting program is a software or control system that designs, sequences, and manages lighting effects and cues for environments such as stages, events, or architectural spaces.
-
B.
daylight illuminant
A daylight illuminant is a standardized light source that models the spectral power distribution of natural daylight for use in color measurement and imaging applications.
-
C.
lighting technology
Lighting technology encompasses the devices, systems, and methods used to produce, control, and distribute light for functional, aesthetic, and energy-efficient illumination in various environments.
-
D.
illuminator
An illuminator is an entity that provides or enhances light, clarity, or understanding within a given environment or context.
-
E.
opacity calculation project
An opacity calculation project is a computational initiative focused on modeling and quantifying how materials absorb, emit, and transmit radiation under varying physical conditions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eee2f9c8190b1272aa2ee55ebf5 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:19 p.m.