Triple

T37840552
Position Surface form Disambiguated ID Type / Status
Subject Adour-Garonne water agency basin E943462 entity
Predicate instanceOf P0 FINISHED
Object river basin management district C28860 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river basin management district
Context triple: [Adour-Garonne water agency basin, instanceOf, river basin management district]
  • A. river basin district chosen
    A river basin district is a designated geographical area comprising one or more neighboring river basins, including their associated groundwater and coastal waters, managed as a single unit for integrated water resources planning and protection.
  • B. watershed district
    A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
  • C. river basin organization
    A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
  • D. river basin management plan
    A river basin management plan is a strategic framework that outlines coordinated actions, policies, and measures to sustainably manage water resources, ecosystems, land use, and human activities within a defined river basin.
  • E. drainage district
    A drainage district is a special governmental or quasi-governmental entity created to manage, finance, and maintain systems that remove excess water from land to prevent flooding and improve land usability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eeb0f7081908d6d3adbc469889c completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.