Triple

T37839683
Position Surface form Disambiguated ID Type / Status
Subject Wuhan metropolitan transport network E943437 entity
Predicate instanceOf P0 FINISHED
Object metropolitan transport network C911 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metropolitan transport network
Context triple: [Wuhan metropolitan transport network, instanceOf, metropolitan transport network]
  • A. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • B. metro network
    A metro network is an interconnected system of urban rail lines, stations, and supporting infrastructure designed to transport large numbers of passengers efficiently within and around a city.
  • C. public transit system chosen
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • E. group of rapid transit lines
    A group of rapid transit lines is a collection of interconnected high-capacity urban rail or metro routes that operate together as a coordinated network to provide frequent, efficient public transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eeb0f7081908d6d3adbc469889c completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.