Triple

T37827994
Position Surface form Disambiguated ID Type / Status
Subject Caltrans District 1 roadway network E943118 entity
Predicate instanceOf P0 FINISHED
Object transportation infrastructure system C3584 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eea4c8c8190a335aed5955cf2db completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.