Triple
T37824037
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Polish Front |
E943002
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | operational sector |
C65097
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: operational sector Context triple: [Polish Front, instanceOf, operational sector]
-
A.
public sector enterprise
A public sector enterprise is an organization owned and operated by the government to provide goods or services, often with broader social or strategic objectives beyond profit.
-
B.
economic sector
An economic sector is a broad category of economic activity that groups industries and businesses based on the type of goods or services they produce or the stage of production they represent.
-
C.
operational concept
An operational concept is a high-level description of how a system, organization, or capability is intended to function in practice to achieve its objectives within a specific context.
-
D.
operational unit
An operational unit is an organized group, department, or component within a larger system that performs specific tasks or functions to achieve defined operational objectives.
-
E.
planned sector
A planned sector is a designated area within a city or region that is systematically organized and developed according to a comprehensive plan for land use, infrastructure, and services.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ee987588190906506e759be5db3 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:19 p.m.