Triple

T37750583
Position Surface form Disambiguated ID Type / Status
Subject Gateway outpost E940970 entity
Predicate instanceOf P0 FINISHED
Object planned space infrastructure C33183 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned space infrastructure
Context triple: [Gateway outpost, instanceOf, planned space infrastructure]
  • A. space infrastructure project chosen
    A space infrastructure project is a large-scale, coordinated initiative to design, build, and operate physical and digital systems that enable sustained activities and services in space, such as communication, transportation, energy, and research.
  • B. series of space stations
    A series of space stations is a sequentially developed set of orbital habitats or platforms, each designed to support human or robotic activities in space and often building on the technology and infrastructure of its predecessors.
  • C. lunar settlement
    A lunar settlement is a permanently inhabited, self-sustaining human community established on the Moon’s surface, designed to support life, work, and resource utilization in the lunar environment.
  • D. space mission
    A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
  • E. planned orbital motorway
    A planned orbital motorway is a proposed high-capacity ring road designed to encircle an urban area or region to redistribute traffic, reduce inner-city congestion, and improve connectivity between radial routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ee1f3a88190834e6c8af99bccc9 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:19 p.m.