Triple

T3772673
Position Surface form Disambiguated ID Type / Status
Subject Euphrátēs E83232 entity
Predicate hasMajorDam P8736 FINISHED
Object Atatürk Dam E87178 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atatürk Dam | Statement: [Euphrátēs, hasMajorDam, Atatürk Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atatürk Dam
Context triple: [Euphrátēs, hasMajorDam, Atatürk Dam]
  • A. Atatürk Dam chosen
    Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
  • B. Keban Dam
    Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
  • C. Osman Sagar Dam
    Osman Sagar Dam is a reservoir dam near Hyderabad, India, built across the Musi River to provide drinking water and flood protection for the city.
  • D. Kok-Aral Dam
    The Kok-Aral Dam is a hydraulic structure in Kazakhstan built to separate and raise water levels in the North Aral Sea, aiding in the partial ecological and economic recovery of the region.
  • E. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b235e608190b5a2b1d1bfcef50b completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69adcc57c9e48190a0f254e47348bf32 completed March 8, 2026, 7:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4e52bb2d08190b457dd517ff366d7 completed March 14, 2026, 4:33 a.m.
Created at: March 8, 2026, 3:36 p.m.