Triple
T37705625
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Schwedenbrücke |
E939190
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge over the Danube Canal |
C65926
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge over the Danube Canal Context triple: [Schwedenbrücke, instanceOf, bridge over the Danube Canal]
-
A.
bridge over the Sava River
A bridge over the Sava River is a structural crossing that spans the river to connect its banks, enabling the movement of people, vehicles, or goods between areas separated by the waterway.
-
B.
bridge in Belgrade
A bridge in Belgrade is a structural crossing over the Sava or Danube rivers that connects different parts of the city, facilitating transportation and symbolizing the urban and historical development of Serbia’s capital.
-
C.
canal bridge
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
-
D.
bridge in Budapest
A bridge in Budapest is a structural crossing over the Danube River that connects the city’s Buda and Pest sides, serving both as vital transportation infrastructure and as an iconic architectural landmark.
-
E.
bridge over the Main
A bridge over the Main is a structural crossing that spans the Main River to connect its opposite banks for transportation and passage.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76edb49dc8190b951dce9ce6ef789 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:18 p.m.