Triple

T37701780
Position Surface form Disambiguated ID Type / Status
Subject Skywalk observation platform E939082 entity
Predicate instanceOf P0 FINISHED
Object glass-floored structure C62108 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glass-floored structure
Context triple: [Skywalk observation platform, instanceOf, glass-floored structure]
  • A. iron-and-glass structure
    An iron-and-glass structure is a building or architectural framework that uses iron elements for support and large expanses of glass for walls or roofing, creating open, light-filled interior spaces.
  • B. glass-bottom bridge chosen
    A glass-bottom bridge is a pedestrian bridge with transparent flooring that allows people to look directly down at the scenery or drop below as they walk across.
  • C. wrought-iron and glass structure
    A wrought-iron and glass structure is an architectural framework that uses forged iron elements to support expansive glass surfaces, creating strong yet visually light enclosures that maximize transparency and natural light.
  • D. floor of a building
    A floor of a building is a horizontal structural level designed to support occupants and activities, typically bounded vertically by ceilings and/or other floors.
  • E. elevated walkway
    An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eda6ae48190b3111071eeacc038 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:18 p.m.