Triple
T37699972
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gibraltar fortress artillery |
E939031
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military fortification component |
C9215
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military fortification component Context triple: [Gibraltar fortress artillery, instanceOf, military fortification component]
-
A.
military fortification system
A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
-
B.
line of fortifications
A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
-
C.
military architecture
Military architecture is the specialized design and construction of fortifications, defensive structures, and related military facilities intended to protect territories, control strategic points, and withstand or conduct armed attacks.
-
D.
masonry fort
A masonry fort is a fortified structure built primarily from stone or brick, designed to provide durable defensive protection against attacks.
-
E.
fortified building
chosen
A fortified building is a heavily constructed structure designed with defensive features such as thick walls, limited entry points, and protective battlements to resist attacks and provide security for its occupants.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eda6ae48190b3111071eeacc038 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:18 p.m.