Triple
T37653569
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan of Implementation of the World Summit on Sustainable Development |
E937236
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | implementation plan |
C11101
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: implementation plan Context triple: [Plan of Implementation of the World Summit on Sustainable Development, instanceOf, implementation plan]
-
A.
plan
chosen
A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
-
B.
integration roadmap
An integration roadmap is a strategic plan that outlines the sequence, timeline, and dependencies for connecting systems, data, and processes to achieve cohesive end-to-end interoperability.
-
C.
revolutionary plan
A revolutionary plan is a bold, comprehensive strategy designed to radically transform existing systems, structures, or conditions through fundamental and often rapid change.
-
D.
political plan
A political plan is a structured strategy outlining specific policies, actions, and timelines that a political actor intends to pursue to achieve defined governance or electoral objectives.
-
E.
long-term plan
A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ed4fe908190b8061c5c135e0971 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:18 p.m.