Triple

T37653569
Position Surface form Disambiguated ID Type / Status
Subject Plan of Implementation of the World Summit on Sustainable Development E937236 entity
Predicate instanceOf P0 FINISHED
Object implementation plan C11101 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: implementation plan
Context triple: [Plan of Implementation of the World Summit on Sustainable Development, instanceOf, implementation plan]
  • A. plan chosen
    A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
  • B. integration roadmap
    An integration roadmap is a strategic plan that outlines the sequence, timeline, and dependencies for connecting systems, data, and processes to achieve cohesive end-to-end interoperability.
  • C. revolutionary plan
    A revolutionary plan is a bold, comprehensive strategy designed to radically transform existing systems, structures, or conditions through fundamental and often rapid change.
  • D. political plan
    A political plan is a structured strategy outlining specific policies, actions, and timelines that a political actor intends to pursue to achieve defined governance or electoral objectives.
  • E. long-term plan
    A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed4fe908190b8061c5c135e0971 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:18 p.m.