Triple
T37619869
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Keasbey and Mattison Company |
E936035
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | asbestos manufacturer |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: asbestos manufacturer Context triple: [Keasbey and Mattison Company, instanceOf, asbestos manufacturer]
-
A.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
B.
cement company
A cement company is a business entity that manufactures and supplies cement and related construction materials for use in building and infrastructure projects.
-
C.
paint manufacturer
A paint manufacturer is a company that formulates, produces, and distributes various types of paints and coatings for residential, commercial, and industrial applications.
-
D.
fabbriceria
A fabbriceria is an Italian ecclesiastical body responsible for the administration, maintenance, and preservation of church buildings and their assets.
-
E.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ed16b748190ad6add183b1be688 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:18 p.m.