Triple

T37617473
Position Surface form Disambiguated ID Type / Status
Subject Kyobashi Station platforms of Keihan Electric Railway E935965 entity
Predicate instanceOf P0 FINISHED
Object railway station platforms C6784 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway station platforms
Context triple: [Kyobashi Station platforms of Keihan Electric Railway, instanceOf, railway station platforms]
  • A. passenger railway platform chosen
    A passenger railway platform is a designated area alongside railway tracks where passengers safely board and alight from trains.
  • B. train station
    A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
  • C. railway station area
    A railway station area is the surrounding zone of a train station that includes platforms, tracks, access roads, passenger facilities, and adjacent public or commercial spaces supporting rail transport activities.
  • D. bus and rail station
    A bus and rail station is a transportation hub where passengers can board, disembark, and transfer between bus and train services within an integrated facility.
  • E. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed16b748190ad6add183b1be688 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:18 p.m.