Triple
T37604827
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Norwegian watercourse network |
E935620
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | watercourse system |
C63366
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: watercourse system Context triple: [Norwegian watercourse network, instanceOf, watercourse system]
-
A.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
B.
hydrological system
A hydrological system is the interconnected network of water storage and movement through the atmosphere, land, and water bodies, driven by processes such as precipitation, evaporation, infiltration, and runoff.
-
C.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
-
D.
watershed
A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
-
E.
surface water system
chosen
A surface water system is a network of natural and engineered features—such as rivers, lakes, reservoirs, and channels—through which water collects, flows, is stored, and is managed on the Earth’s surface.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ed0a85481909254a8a89090c826 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:18 p.m.