Triple

T37575054
Position Surface form Disambiguated ID Type / Status
Subject Ken Griffey Sr. and Ken Griffey Jr. E934794 entity
Predicate accomplished P158464 FINISHED
Object hit back-to-back home runs in same MLB game LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: hit back-to-back home runs in same MLB game | Statement: [Ken Griffey Sr. and Ken Griffey Jr., accomplished, hit back-to-back home runs in same MLB game]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: accomplished
Context triple: [Ken Griffey Sr. and Ken Griffey Jr., accomplished, hit back-to-back home runs in same MLB game]
  • A. achieved
    Indicates that an entity successfully reached, obtained, or accomplished a specified goal, result, or state.
  • B. coAchieved chosen
    Indicates that two or more entities jointly accomplished or attained the same goal, outcome, or achievement.
  • C. achievedThrough
    Indicates that a result, state, or outcome is brought about or realized by means of a specified method, process, or action.
  • D. committed
    Indicates that an agent has carried out or been responsible for a specific act, event, or wrongdoing.
  • E. finished
    Indicates that an entity has completed an action, process, or state, reaching its end point.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ecd99148190be327e391a70f5b6 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fba61dff5081909fec88a7aeb0c8a1 completed May 6, 2026, 8:35 p.m.
PD Predicate disambiguation batch_69fba350e9a8819095893229d9643572 completed May 6, 2026, 8:23 p.m.
Created at: May 3, 2026, 4:17 p.m.