Triple
T37572278
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GMA Tower of Power |
E934720
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | broadcast transmission facility |
C2861
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: broadcast transmission facility Context triple: [GMA Tower of Power, instanceOf, broadcast transmission facility]
-
A.
broadcast transmission operator
A broadcast transmission operator is responsible for setting up, monitoring, and adjusting the technical equipment that sends audio and video signals from a studio or control room to broadcast, cable, or streaming distribution systems.
-
B.
broadcast station
chosen
A broadcast station is a facility equipped to transmit audio, video, or data content over radio, television, or digital channels to a dispersed audience.
-
C.
broadcast television station
A broadcast television station is a facility that produces, assembles, and transmits television programming over the airwaves to be received by the general public within a designated coverage area.
-
D.
broadcast control facility
A broadcast control facility is a centralized location equipped with the systems and personnel needed to manage, monitor, and direct the transmission and routing of broadcast audio and video content.
-
E.
broadcast infrastructure provider
A broadcast infrastructure provider is an organization that designs, builds, operates, and maintains the technical networks and facilities required to transmit audio, video, and data content from broadcasters to end audiences across various distribution platforms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ecd99148190be327e391a70f5b6 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:17 p.m.