Triple

T37504174
Position Surface form Disambiguated ID Type / Status
Subject Gallatin Plan E932048 entity
Predicate instanceOf P0 FINISHED
Object infrastructure plan C28917 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure plan
Context triple: [Gallatin Plan, instanceOf, infrastructure plan]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • C. infrastructure strategy report
    A comprehensive document that analyzes current infrastructure assets, forecasts future needs, and outlines prioritized investments and policies to guide long-term infrastructure development and management.
  • D. government infrastructure pipeline chosen
    A government infrastructure pipeline is a structured, long-term sequence of planned, funded, and prioritized public works projects—such as transportation, utilities, and civic facilities—designed to guide investment, development, and maintenance of essential national or regional infrastructure.
  • E. aviation infrastructure plan
    An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ec5268481909ea01c73aeeefd42 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:17 p.m.