Triple
T37493542
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Performa 5260CD |
E931763
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | all-in-one Macintosh computer |
C10955
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: all-in-one Macintosh computer Context triple: [Performa 5260CD, instanceOf, all-in-one Macintosh computer]
-
A.
Macintosh computer
chosen
A Macintosh computer is a line of personal computers designed and sold by Apple that integrates proprietary hardware and macOS software into a unified, user-friendly system.
-
B.
Apple II series computer
The Apple II series computer is a line of early personal computers introduced by Apple in 1977, known for their color graphics, expandability, and pivotal role in popularizing home and educational computing.
-
C.
Amiga computer
An Amiga computer is a family of personal computers developed by Commodore in the 1980s and early 1990s, known for their advanced multimedia capabilities, custom chipset, and multitasking operating system.
-
D.
PDP series computer
A PDP series computer is a family of minicomputers produced by Digital Equipment Corporation (DEC) from the 1960s to 1980s, known for their relatively low cost, interactive use, and significant influence on computer architecture and operating systems.
-
E.
S-100 bus computer
An S-100 bus computer is a microcomputer system built around the S-100 expansion bus standard, using a backplane and plug-in cards for CPU, memory, and I/O to create a modular, expandable architecture.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ec457a4819094eeb3aed9baac11 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:17 p.m.