Triple

T37484888
Position Surface form Disambiguated ID Type / Status
Subject 999 emergency operations centre E931502 entity
Predicate hasBackup P195522 FINISHED
Object redundant communication systems LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: redundant communication systems | Statement: [999 emergency operations centre, hasBackup, redundant communication systems]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasBackup
Context triple: [999 emergency operations centre, hasBackup, redundant communication systems]
  • A. servesAsBackupFor
    Indicates that one entity functions as a substitute or fallback that can take over the role or responsibilities of another entity if needed.
  • B. supportsBackupCopy
    Indicates that one entity provides the capability or functionality to create, maintain, or use a backup copy of another entity.
  • C. supportsBackupPlans
    Indicates that an entity provides assistance, resources, or endorsement for alternative or contingency plans associated with another entity or situation.
  • D. hasBackupStories
    Indicates that an entity maintains additional, alternative stories or narratives that can be used if the primary ones fail or are unavailable.
  • E. hasBackupBattery
    Indicates that an entity is equipped with an additional battery intended to provide power when the primary power source is unavailable or fails.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ec382248190b47844df596123c6 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fdd5fba5048190b7d430ae2054a1fd completed May 8, 2026, 12:24 p.m.
PD Predicate disambiguation batch_69fdd35f76f88190a1854ea27132f9c7 completed May 8, 2026, 12:13 p.m.
PDg Predicate description generation batch_69fdd5faea908190a17d77e050362ef5 completed May 8, 2026, 12:24 p.m.
Created at: May 3, 2026, 4:17 p.m.