Triple

T37483632
Position Surface form Disambiguated ID Type / Status
Subject Lahore–Islamabad Motorway (M-2) project E931472 entity
Predicate instanceOf P0 FINISHED
Object motorway construction project C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: motorway construction project
Context triple: [Lahore–Islamabad Motorway (M-2) project, instanceOf, motorway construction project]
  • A. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • B. planned expressway
    A planned expressway is a proposed high-speed, limited-access roadway that has been formally designed and approved but not yet constructed or opened to traffic.
  • C. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • D. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • E. motorway cutting
    A motorway cutting is a man-made excavation through higher ground that creates a lowered passage for a motorway, typically with exposed earth or rock faces on either side.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ec382248190b47844df596123c6 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:17 p.m.