Triple

T37462023
Position Surface form Disambiguated ID Type / Status
Subject C’Thun Warrior E930940 entity
Predicate gamePlanEarly P44446 FINISHED
Object play C’Thun buff minions LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: play C’Thun buff minions | Statement: [C’Thun Warrior, gamePlanEarly, play C’Thun buff minions]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gamePlanEarly
Context triple: [C’Thun Warrior, gamePlanEarly, play C’Thun buff minions]
  • A. postGamesPlan
    Indicates that an entity publishes or shares a plan or strategy related to games after they have concluded.
  • B. partOfPlan
    Indicates that one entity is included as a component or step within a broader plan or strategy.
  • C. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • D. earlyStrategy chosen
    Indicates that an entity adopts or implements a strategy at an early stage or time relative to a process, event, or development.
  • E. planningProcess
    Indicates a relationship where an entity is engaged in or associated with the structured activity of defining goals, strategies, and steps to achieve a desired outcome.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ec1a1148190b0a961f188d621b0 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fbc36ce1f88190a7fa1656b714e107 completed May 6, 2026, 10:40 p.m.
PD Predicate disambiguation batch_69fbbd13595c81908719f52c3d37a7e8 completed May 6, 2026, 10:13 p.m.
Created at: May 3, 2026, 4:17 p.m.