Triple

T3745963
Position Surface form Disambiguated ID Type / Status
Subject Measure R transportation projects E81211 entity
Predicate instanceOf P0 FINISHED
Object public transit and highway improvement program C14043 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transit and highway improvement program
Context triple: [Measure R transportation projects, instanceOf, public transit and highway improvement program]
  • A. highway funding program
    A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
  • B. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • C. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • D. highway
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b19b7b08190a6188804e99c53e9 completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:35 p.m.