Triple

T37451960
Position Surface form Disambiguated ID Type / Status
Subject North Building E930691 entity
Predicate instanceOf P0 FINISHED
Object convention center building wing C24259 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: convention center building wing
Context triple: [North Building, instanceOf, convention center building wing]
  • A. convention center
    A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
  • B. building wing chosen
    A building wing is a distinct, often elongated section of a larger building that extends from the main structure and typically serves a specific functional or spatial purpose.
  • C. conference center
    A conference center is a large, purpose-built facility designed to host meetings, conventions, exhibitions, and other events, providing flexible spaces and supporting services for groups of various sizes.
  • D. convention center authority
    A convention center authority is a governing or managing body responsible for the planning, operation, financing, and promotion of a convention center facility or system of facilities.
  • E. conference center design
    Conference center design focuses on planning and organizing spaces, circulation, technology, and support facilities to efficiently host a variety of events and accommodate diverse user needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ec0b9488190b7a4fae632bd1d2f completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:17 p.m.