Triple
T37448602
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NIOSH Alerts |
E930620
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hazard alert bulletin |
C30141
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hazard alert bulletin Context triple: [NIOSH Alerts, instanceOf, hazard alert bulletin]
-
A.
early warning centre
An early warning centre is a facility or system that continuously monitors hazards, analyzes risk data, and issues timely alerts to help authorities and the public take preventive or protective action.
-
B.
public warning system
A public warning system is an organized infrastructure of technologies, protocols, and communication channels designed to rapidly alert and inform the public about imminent or ongoing emergencies and hazards.
-
C.
navigation hazard
A navigation hazard is any physical or environmental condition that poses a risk to the safe movement and guidance of vehicles, vessels, or aircraft along their intended route.
-
D.
occupational safety and health bulletin
chosen
An occupational safety and health bulletin is an official communication document that provides workers and employers with concise, authoritative information, alerts, and guidance on preventing workplace injuries, illnesses, and hazards.
-
E.
emergency alerting standard
An emergency alerting standard is a formal specification that defines how urgent public safety messages are created, formatted, transmitted, and delivered across communication systems to warn and inform people during crises.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ec0b9488190b7a4fae632bd1d2f |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:17 p.m.