Triple
T37429842
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Swift Creek (Tar River tributary) |
E930103
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river in North Carolina |
C79
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river in North Carolina Context triple: [Swift Creek (Tar River tributary), instanceOf, river in North Carolina]
-
A.
river
chosen
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
B.
town in North Carolina
A town in North Carolina is a municipally incorporated community within the state that provides local governance, services, and regulations for its residents under North Carolina law.
-
C.
former surface river
A former surface river is a once-active, above-ground watercourse that has ceased to flow or has been diverted, leaving behind geomorphic or ecological evidence of its past presence.
-
D.
river corridor
A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
-
E.
river gorge
A river gorge is a deep, narrow valley with steep, often rocky walls carved over time by the persistent erosive action of a river.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ebf0f288190ba198a78341613b8 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.