Triple

T37403829
Position Surface form Disambiguated ID Type / Status
Subject Dell OpenManage E929070 entity
Predicate instanceOf P0 FINISHED
Object systems management software suite C9699 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: systems management software suite
Context triple: [Dell OpenManage, instanceOf, systems management software suite]
  • A. system administration tool chosen
    A system administration tool is software that helps IT professionals manage, configure, monitor, and automate tasks across computer systems and networks.
  • B. software management framework
    A software management framework is a structured set of processes, tools, and best practices that guide the planning, development, deployment, maintenance, and governance of software systems throughout their lifecycle.
  • C. application management system
    An application management system is a software platform that streamlines the end-to-end process of receiving, tracking, evaluating, and managing applications and related communications.
  • D. System software
    System software is a collection of programs that manage and control computer hardware resources and provide a platform for running application software.
  • E. system utility software
    System utility software is specialized programs designed to manage, optimize, maintain, and support the underlying operations and resources of a computer system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ebbf79c8190b85bbcf3a6be57e4 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:16 p.m.