Triple

T37369156
Position Surface form Disambiguated ID Type / Status
Subject Oath of the Men of the Mountains to Isildur E927789 entity
Predicate fulfilledDuring P43883 FINISHED
Object War of the Ring NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: War of the Ring | Statement: [Oath of the Men of the Mountains to Isildur, fulfilledDuring, War of the Ring]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: fulfilledDuring
Context triple: [Oath of the Men of the Mountains to Isildur, fulfilledDuring, War of the Ring]
  • A. concludedDuring
    Indicates that an event, process, or state ended within the temporal bounds of another specified time period or event.
  • B. executedDuring chosen
    Indicates that an action or event was carried out within the temporal span of another specified event or period.
  • C. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • D. returnedDuring
    Indicates that one entity was given back or restored to another entity within a specified time period or event.
  • E. completedBy
    Indicates that a task, process, or action has been finished or carried out by a particular entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb820248190a5c395ca50ad002a completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fb8c38a9688190be524246f5682107 completed May 6, 2026, 6:45 p.m.
PD Predicate disambiguation batch_69fb5a9c6e0481908565bd849e869b24 completed May 6, 2026, 3:13 p.m.
Created at: May 3, 2026, 4:16 p.m.