Triple
T37333459
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Intel Leixlip campus |
E926819
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | semiconductor manufacturing plant |
C1382
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: semiconductor manufacturing plant Context triple: [Intel Leixlip campus, instanceOf, semiconductor manufacturing plant]
-
A.
semiconductor manufacturing facility
chosen
A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
-
B.
semiconductor manufacturing company
A semiconductor manufacturing company is an organization that designs, fabricates, tests, and packages integrated circuits and other semiconductor devices for use in electronic products and systems.
-
C.
semiconductor manufacturing process
The semiconductor manufacturing process is a highly controlled, multi-step sequence of fabrication, patterning, doping, and layering operations used to transform raw silicon wafers into functional integrated circuits and microchips.
-
D.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
E.
semiconductor manufacturing equipment component
A semiconductor manufacturing equipment component is a specialized mechanical, electrical, or electronic part designed to perform a specific function within tools that fabricate, process, or inspect semiconductor wafers and devices.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eb4e8a881908bd40da28f36fc7e |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.