Triple

T37333459
Position Surface form Disambiguated ID Type / Status
Subject Intel Leixlip campus E926819 entity
Predicate instanceOf P0 FINISHED
Object semiconductor manufacturing plant C1382 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: semiconductor manufacturing plant
Context triple: [Intel Leixlip campus, instanceOf, semiconductor manufacturing plant]
  • A. semiconductor manufacturing facility chosen
    A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
  • B. semiconductor manufacturing company
    A semiconductor manufacturing company is an organization that designs, fabricates, tests, and packages integrated circuits and other semiconductor devices for use in electronic products and systems.
  • C. semiconductor manufacturing process
    The semiconductor manufacturing process is a highly controlled, multi-step sequence of fabrication, patterning, doping, and layering operations used to transform raw silicon wafers into functional integrated circuits and microchips.
  • D. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • E. semiconductor manufacturing equipment component
    A semiconductor manufacturing equipment component is a specialized mechanical, electrical, or electronic part designed to perform a specific function within tools that fabricate, process, or inspect semiconductor wafers and devices.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb4e8a881908bd40da28f36fc7e completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:16 p.m.