Triple
T37325759
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BMC Education Committee |
E926598
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | education committee |
C41838
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: education committee Context triple: [BMC Education Committee, instanceOf, education committee]
-
A.
education association
An education association is an organized group that supports, advocates for, and advances the interests, standards, and professional development of individuals and institutions involved in education.
-
B.
education policy body
An education policy body is an organization or governing entity responsible for developing, overseeing, and evaluating policies and regulations that shape the structure, standards, and operation of an education system.
-
C.
school board
A school board is a governing body of elected or appointed members responsible for setting policies, overseeing budgets, and guiding the strategic direction of a school district.
-
D.
education regulatory authority
An education regulatory authority is a governing body responsible for setting, monitoring, and enforcing standards, policies, and regulations to ensure the quality, equity, and compliance of educational institutions and systems.
-
E.
college committee
chosen
A college committee is a formally organized group within a college composed of faculty, staff, and sometimes students, tasked with deliberating on specific academic or administrative issues and making recommendations or decisions to support institutional governance and operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eb386d88190a8d511aa11540dfc |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.