Triple

T37314216
Position Surface form Disambiguated ID Type / Status
Subject Central Electricity Regulatory Commission E926289 entity
Predicate continuedUnderAct P16698 FINISHED
Object Electricity Act, 2003 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Electricity Act, 2003 | Statement: [Central Electricity Regulatory Commission, continuedUnderAct, Electricity Act, 2003]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: continuedUnderAct
Context triple: [Central Electricity Regulatory Commission, continuedUnderAct, Electricity Act, 2003]
  • A. continuedThrough
    Indicates that an event, state, or process persisted without interruption across or beyond a specified point, period, or boundary.
  • B. continuedBy
    Indicates that one entity carries on, extends, or resumes the activity, process, or sequence initiated by another entity.
  • C. constructionContinuedUnder chosen
    Indicates that construction activity on something persisted or proceeded during the time or under the authority, control, or conditions associated with a specified entity or period.
  • D. continuesCourseOf
    Indicates that one course, treatment, or process is carried on, extended, or maintained as a direct continuation of another.
  • E. continuesFor
    Indicates that an event, state, or process persists or remains in effect for a specified duration or period.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb28af88190b093b32e3fd614ab completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fdb31800508190beec15adb9bbd292 completed May 8, 2026, 9:55 a.m.
PD Predicate disambiguation batch_69fdb19c381c8190bafb2f565da097f1 completed May 8, 2026, 9:49 a.m.
Created at: May 3, 2026, 4:16 p.m.