Triple

T37309309
Position Surface form Disambiguated ID Type / Status
Subject Los Tranvías de Zaragoza E926161 entity
Predicate instanceOf P0 FINISHED
Object tramway operating company C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tramway operating company
Context triple: [Los Tranvías de Zaragoza, instanceOf, tramway operating company]
  • A. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • B. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • C. operating company
    An operating company is a business entity that actively conducts day-to-day commercial activities, producing goods or services, rather than primarily holding investments or assets.
  • D. tramway line group
    A tramway line group is a collection of related tram lines that operate together as a coordinated service, often sharing routes, infrastructure, or operational management.
  • E. monorail company
    A monorail company is an organization that designs, builds, operates, and maintains single-rail transit systems for urban or specialized transportation needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb1bc508190924e9fa5d8acdeb3 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:16 p.m.