Triple

T37301359
Position Surface form Disambiguated ID Type / Status
Subject Athena II E925951 entity
Predicate stage3Engine P25128 FINISHED
Object Orbus 21D NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Orbus 21D | Statement: [Athena II, stage3Engine, Orbus 21D]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: stage3Engine
Context triple: [Athena II, stage3Engine, Orbus 21D]
  • A. stage3Completed
    Indicates that the third stage in a defined multi-stage process has been successfully completed.
  • B. stage3Includes
    Indicates that a process or workflow’s third stage contains, encompasses, or incorporates a specified component, step, or element.
  • C. thirdStageEngineType chosen
    Indicates the specific type or model of engine used in the third stage of a multi-stage launch vehicle or rocket.
  • D. fourthStageEngine
    Indicates that an engine functions as the fourth propulsion stage in a multi-stage system or sequence.
  • E. stage2Completed
    Indicates that the second stage of a defined multi-stage process or workflow has been successfully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb1bc508190924e9fa5d8acdeb3 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fba78aca4c8190b8f1831e8cc04e06 completed May 6, 2026, 8:41 p.m.
PD Predicate disambiguation batch_69fba34a65a4819088bac6c17542d71c completed May 6, 2026, 8:23 p.m.
Created at: May 3, 2026, 4:16 p.m.