Triple
T37273101
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Swimming Stadium |
E924566
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | outdoor swimming complex |
C345
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: outdoor swimming complex Context triple: [Swimming Stadium, instanceOf, outdoor swimming complex]
-
A.
swimming facility
chosen
A swimming facility is a dedicated venue equipped with pools and related amenities designed for aquatic recreation, exercise, training, and competitions.
-
B.
outdoor water park
An outdoor water park is a recreational facility featuring open-air water-based attractions such as pools, slides, splash pads, and lazy rivers designed for seasonal, weather-dependent fun and relaxation.
-
C.
watersports venue
A watersports venue is a designated location equipped and managed for hosting a variety of water-based recreational and competitive activities.
-
D.
ocean pool
An ocean pool is a man-made swimming enclosure built into or alongside the coastline that fills with seawater, providing a protected area for bathing while remaining connected to the natural marine environment.
-
E.
lagoon complex
A lagoon complex is an interconnected system of shallow coastal water bodies, channels, and associated landforms that together form a dynamic, semi-enclosed marine environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eacdd8c819094080d3991e6d37c |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:15 p.m.