Triple
T37248540
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Furano–Biei Norokko |
E923928
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sightseeing train |
C15754
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sightseeing train Context triple: [Furano–Biei Norokko, instanceOf, sightseeing train]
-
A.
tourist shuttle train
A tourist shuttle train is a small, often open-air rail vehicle designed to transport visitors along scenic or attraction-focused routes, typically at low speeds with frequent stops.
-
B.
rail transport attraction
chosen
A rail transport attraction is a tourism-focused facility or experience centered around trains, railways, or rail-related activities, designed to entertain, educate, or provide unique travel experiences to visitors.
-
C.
luxury train
A luxury train is an opulent rail vehicle or service designed to provide high-end comfort, fine dining, and exclusive amenities while transporting passengers in style over scenic or long-distance routes.
-
D.
named train
A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
-
E.
trolley ride
A trolley ride is a short journey taken on a rail-guided streetcar or tram, often for urban transport or leisurely sightseeing.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eaabb4c819093b751b139dad551 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:15 p.m.