Triple

T3724771
Position Surface form Disambiguated ID Type / Status
Subject Signetics E81722 entity
Predicate instanceOf P0 FINISHED
Object integrated circuit manufacturer C3679 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: integrated circuit manufacturer
Context triple: [Signetics, instanceOf, integrated circuit manufacturer]
  • A. Fabless semiconductor company chosen
    A fabless semiconductor company is a business that designs and sells integrated circuits and other semiconductor devices while outsourcing the actual manufacturing to specialized fabrication plants (foundries).
  • B. integrated circuit technology
    Integrated circuit technology is the design and fabrication of miniaturized electronic circuits on semiconductor chips, enabling complex, high-speed, and low-power electronic systems.
  • C. semiconductor manufacturing facility
    A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
  • D. semiconductor engineer
    A semiconductor engineer designs, develops, and optimizes microelectronic devices and integrated circuits by applying principles of materials science, electrical engineering, and manufacturing processes.
  • E. analog integrated circuit
    An analog integrated circuit is an electronic device that processes continuous-time, continuously variable signals using interconnected analog components such as amplifiers, resistors, capacitors, and transistors on a single semiconductor chip.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1b7ef081908d2d381bbf54985a completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:34 p.m.