Triple

T3722773
Position Surface form Disambiguated ID Type / Status
Subject Yellow Line (CTA) E81677 entity
Predicate instanceOf P0 FINISHED
Object Chicago Transit Authority line C640 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chicago Transit Authority line
Context triple: [Yellow Line (CTA), instanceOf, Chicago Transit Authority line]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. tram line
    A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
  • C. rapid transit line chosen
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • E. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1b7ef081908d2d381bbf54985a completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:34 p.m.