Triple
T37199220
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NCPST |
E921681
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | plasma research center |
C30062
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: plasma research center Context triple: [NCPST, instanceOf, plasma research center]
-
A.
plasma research centre
chosen
A plasma research centre is a specialized facility dedicated to studying the properties, behavior, and applications of ionized gases for scientific and technological advancement.
-
B.
physics research centre
A physics research centre is an institution dedicated to advancing knowledge in physics through experimental and theoretical research, collaboration, and the development of new technologies.
-
C.
plasma physicist
A plasma physicist is a scientist who studies ionized gases and their behavior under electric and magnetic fields to understand natural phenomena and develop advanced technologies such as fusion energy and space propulsion.
-
D.
research and education centre
A research and education centre is an institution dedicated to generating new knowledge through systematic investigation and disseminating it through structured teaching, training, and outreach activities.
-
E.
polar research center
A polar research center is a specialized facility dedicated to conducting scientific studies and monitoring environmental conditions in Arctic and Antarctic regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ea313a08190a54404cd1e47da90 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:15 p.m.