Triple
T37123970
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Academy Day events |
E919339
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | television industry event series |
C43629
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: television industry event series Context triple: [International Academy Day events, instanceOf, television industry event series]
-
A.
television event
A television event is a scheduled broadcast program or special presentation designed for viewing on television, often characterized by its significance, live nature, or anticipated large audience.
-
B.
television industry
The television industry encompasses the businesses, technologies, and creative processes involved in producing, distributing, and monetizing television content across broadcast, cable, and streaming platforms.
-
C.
television awards ceremony
chosen
A television awards ceremony is a formal event where achievements in television production and performance are recognized and honored through the presentation of various awards.
-
D.
television series
A television series is a serialized audiovisual narrative or program produced for broadcast or streaming, released in multiple episodes often organized into seasons.
-
E.
television series organization
A television series organization is an entity responsible for the planning, production, coordination, and management of all creative, technical, and logistical aspects involved in creating and distributing a TV series.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e9d13e48190a108f7fbf80ff375 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:15 p.m.