Triple
T37116762
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Remodeling and extensions of Bombay docks |
E919138
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 19th-century construction project |
C20963
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 19th-century construction project Context triple: [Remodeling and extensions of Bombay docks, instanceOf, 19th-century construction project]
-
A.
19th-century architectural project
A 19th-century architectural project is a planned building or complex designed and developed during the 1800s, reflecting the period’s characteristic styles, technologies, and cultural influences.
-
B.
19th-century infrastructure
chosen
19th-century infrastructure encompasses the transportation, communication, and utility systems—such as railways, canals, telegraph networks, roads, and early urban services—built during the 1800s that enabled industrialization and expanded economic and social connectivity.
-
C.
19th-century bridge
A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
-
D.
19th-century monument
A 19th-century monument is a commemorative structure or sculpture created between 1801 and 1900 that reflects the artistic styles, cultural values, and historical events of that era.
-
E.
18th-century architectural project
An 18th-century architectural project is a designed building or complex conceived and planned during the 1700s, reflecting the period’s prevailing styles, construction techniques, and cultural or political ideals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e9c57148190ba789dd059645bb9 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:15 p.m.