Triple
T37116585
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mumbai Division |
E919132
|
entity |
| Predicate | railSafetyAuthority |
P69118
|
FINISHED |
| Object | Commissioner of Railway Safety (Western Circle, as applicable) |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Commissioner of Railway Safety (Western Circle, as applicable) | Statement: [Mumbai Division, railSafetyAuthority, Commissioner of Railway Safety (Western Circle, as applicable)]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: railSafetyAuthority Context triple: [Mumbai Division, railSafetyAuthority, Commissioner of Railway Safety (Western Circle, as applicable)]
-
A.
railRegulator
chosen
Indicates that an entity serves as an authority responsible for overseeing, regulating, or enforcing rules within the railway or rail transport sector.
-
B.
railwaySecured
Indicates that a railway or rail line has been made safe, protected, or brought under control, ensuring secure passage or operation.
-
C.
railwayInfrastructureManager
Indicates that one entity is responsible for managing, maintaining, and operating the railway infrastructure used by another entity.
-
D.
railwayAccess
Indicates that an entity has direct access to, connection with, or service by a railway line or station.
-
E.
railroadSafetyIssueAddressed
Indicates that a previously identified railroad safety issue has been resolved or appropriately mitigated through corrective actions.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e9c57148190ba789dd059645bb9 |
completed | May 3, 2026, 3:49 p.m. |
| NER | Named-entity recognition | batch_69fb344c60f8819090f2e21e1e61d621 |
completed | May 6, 2026, 12:30 p.m. |
| PD | Predicate disambiguation | batch_69fb2f642db08190b562725502c74ea6 |
completed | May 6, 2026, 12:09 p.m. |
Created at: May 3, 2026, 4:15 p.m.