Triple
T37114917
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NSICT |
E919091
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | private container terminal |
C26575
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: private container terminal Context triple: [NSICT, instanceOf, private container terminal]
-
A.
container terminal complex
chosen
A container terminal complex is a large, integrated facility where containerized cargo is transferred between ships, trucks, and trains, supported by specialized infrastructure, equipment, and logistics services.
-
B.
component container
A component container is an object that holds, manages, and coordinates the lifecycle and interactions of a collection of related components.
-
C.
terminus
A terminus is the final point or boundary at which a process, journey, or system comes to an end.
-
D.
terminal emulator
A terminal emulator is a software application that replicates the functionality of a traditional hardware terminal, allowing users to interact with a computer’s command-line interface within a graphical or text-based environment.
-
E.
maritime cargo terminal
A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e9c57148190ba789dd059645bb9 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:15 p.m.