Triple

T37083657
Position Surface form Disambiguated ID Type / Status
Subject Julie Powell’s Julia Child cooking blog project E918224 entity
Predicate instanceOf P0 FINISHED
Object blog project C18176 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: blog project
Context triple: [Julie Powell’s Julia Child cooking blog project, instanceOf, blog project]
  • A. project
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • B. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • C. personal blog chosen
    A personal blog is an online journal-style website where an individual regularly publishes posts sharing their thoughts, experiences, opinions, and interests with an audience.
  • D. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • E. group blog
    A group blog is a shared online platform where multiple authors collaboratively publish and manage posts, often around common themes or interests.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e9952b88190a6fe01ba01476520 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.