Triple

T37077260
Position Surface form Disambiguated ID Type / Status
Subject St. Mary the Virgin, New York (work on interior and fittings) E917742 entity
Predicate instanceOf P0 FINISHED
Object church interior design project C3258 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: church interior design project
Context triple: [St. Mary the Virgin, New York (work on interior and fittings), instanceOf, church interior design project]
  • A. ecclesiastical interior design chosen
    Ecclesiastical interior design is the specialized practice of planning and arranging church and other sacred-space interiors to support worship, reflect theological symbolism, and enhance spiritual experience through architecture, furnishings, and liturgical art.
  • B. church interior
    A church interior is the enclosed sacred space within a church building, typically featuring an altar, nave, pews, and religious iconography arranged to support worship and communal gatherings.
  • C. cathedral design
    Cathedral design is the conceptual planning and organization of a cathedral’s spatial layout, structural system, aesthetic elements, and symbolic features to support liturgical functions and spiritual experience.
  • D. church restoration project
    A church restoration project is an organized effort to repair, preserve, and sometimes modernize a church building while respecting and maintaining its historical, architectural, and spiritual significance.
  • E. church rebuilding project
    A church rebuilding project is a coordinated effort to restore, reconstruct, or significantly renovate a church’s physical structure and facilities, often driven by structural needs, historical preservation, or community growth.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e9771e08190a690834e3cd20654 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.