Triple

T37065688
Position Surface form Disambiguated ID Type / Status
Subject British Empire air services E917436 entity
Predicate instanceOf P0 FINISHED
Object aviation organization network C63844 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aviation organization network
Context triple: [British Empire air services, instanceOf, aviation organization network]
  • A. aviation infrastructure organization
    An aviation infrastructure organization is an entity responsible for planning, developing, operating, and maintaining the physical and technological systems that support air transportation, such as airports, air traffic control, and related facilities.
  • B. aviation directory
    An aviation directory is a structured listing of aviation-related entities—such as airports, airlines, aircraft operators, services, and facilities—organized to enable quick lookup and reference.
  • C. aviation infrastructure network
    An aviation infrastructure network is an interconnected system of airports, airways, navigation aids, communication systems, and support facilities that collectively enable the safe, efficient movement of aircraft and passengers.
  • D. air navigation organization
    An air navigation organization is an entity responsible for planning, managing, and controlling the safe and efficient movement of aircraft through designated airspace using air traffic services, communication, navigation, and surveillance systems.
  • E. aviation authority
    An aviation authority is a governmental or regulatory body responsible for overseeing civil aviation safety, security, standards, and compliance within a specific jurisdiction.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e95fa40819091e14681087ae5e4 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.