Triple

T37061438
Position Surface form Disambiguated ID Type / Status
Subject さくらであい館 E917334 entity
Predicate instanceOf P0 FINISHED
Object 河川敷施設 C10816 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 河川敷施設
Context triple: [さくらであい館, instanceOf, 河川敷施設]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. lakeside infrastructure
    Lakeside infrastructure encompasses the built facilities and systems—such as docks, marinas, retaining walls, pathways, utilities, and shoreline protections—designed to support human use, access, and environmental management along lake shores.
  • C. river structure
    A river structure is any engineered or natural formation built in, on, or alongside a river to influence its flow, stability, navigation, or ecological function.
  • D. river corridor chosen
    A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
  • E. waterway feature
    A waterway feature is any natural or man-made linear or areal element that involves the presence, movement, or containment of water, such as rivers, canals, streams, or channels.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e95fa40819091e14681087ae5e4 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.