Triple
T37027493
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pulham Airship Station |
E916395
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airship station |
C8154
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airship station Context triple: [Pulham Airship Station, instanceOf, airship station]
-
A.
airship hangar
chosen
An airship hangar is a large, often elongated structure designed to house, protect, and maintain airships and other lighter-than-air craft.
-
B.
airship commander
An airship commander is the strategic leader responsible for navigating, operating, and directing an airship and its crew during both routine voyages and critical missions.
-
C.
surface station
A surface station is a ground-based facility equipped with instruments and systems to monitor, control, or communicate with external environments or assets such as weather, spacecraft, or remote sensors.
-
D.
aerial stronghold
An aerial stronghold is a heavily fortified structure or mobile fortress suspended in the sky, designed to project power, provide defense, and serve as a strategic command center from above.
-
E.
spaceport facility
A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e92c7648190bcfa277f64c71a21 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:14 p.m.